Analisis Cycle Time Mesin S Pada Filling Plant PT. XYZ Tbk. Surabaya

Authors

  • Filippo Alvandi Sumuweng Universitas Katolik Darma Cendika
  • Lusi Mei Cahya Wulandari Universitas Katolik Darma Cendika

Keywords:

cycle time, filling plant, time study, production efficiency, Serac machine

Abstract

The discrepancy between actual cycletimeand production targets may affect the stability and efficiency of the cooking oil packaging process. This study aims to analyze the cycletimeof Machine S in the FillingPlantof PT XYZ Tbk. Surabaya for 485 ml packaging production and to evaluate process stability against company standards. The method employed was a timestudy conducted through direct measurements using a stopwatch, supported by production data from June 2025, machine target data, and process production data. The results indicate that the actual cycletimeof 15 seconds per unit is lower than the company’s takttimeof 15.7 seconds per unit, demonstrating that the production process is capable of meeting the target of 1,720 bottles per shift. These findings suggest that the fillingplantsystem operates stably in accordance with established operational standards. This research serves as both an evaluation of process timeperformance and a validation of time-based production control implementation. The results are expected to provide a foundation for continuous monitoring and contribute to future studies on productivity and efficiency in manufacturing packaging lines.

References

Achmadi, F., Harsanto, B., & Yunani, A. (2021). Analisis cycle time proses perakitan senjata di PT Pindad ( Persero ) ( Cycle time analysis of weapon assembly process in PT Pindad ( Persero )). 13(2), 159–168.

Andriana, A. N. (2021). DINAMIKA HARGA MINYAK GORENG SERTA DAMPAKNYA TERHADAP PENGUKURAN STANDAR KUALITAS PRODUK. 158, 62–80. https://doi.org/10.24034/j25485024.y2023.v7.i1.5186

Brilianti, G. P., Wastianto, A., & Putra, P. S. (2025). Pengukuran efektivitas mesin cylinder block menggunakan metode overall equipment effectiveness serta analisis fishbone di PT ABC Measuring the effectiveness of cylinder block machines using the overall equipment effectiveness method and fishbone analysis at PT ABC. 6, 233–243.

Nurhasanah, A., Rahayu, S., & Windyatri, H. (2025). Analisis penerapan lean manufacturing untuk menurunkan cycle time pada proses produksi dengan menggunakan metode PDCA di PT XYZ Analysis of lean manufacturing implementation to reduce cycle time in the production process using the PDCA method at PT XYZ. 6, 57–69.

Saputra, M. F. R. (2024). Penerapan Lean Manufacturing Guna Mengurangi Cycle Time Pada Proses Batik Tulis Motif Truntum. https://dspace.uii.ac.id/handle/123456789/52639%0Ahttps://dspace.uii.ac.id/bitstream/handle/123456789/52639/20522112.pdf?sequence=1

Siagian, W. T. W., & TEKMAPRO, J. A. S. (2024). Analisis Penerapan Lean Manufacturing Dengan Metode Vsm (Value Stream Mapping) Guna Mengurangi Waste Dan Cycle Time Pada Proses Produksi Keramik Di Pt Xyz. Tekmapro, 19(2), 242–253. https://doi.org/10.33005/tekmapro.v19i2.419

Suwandi, N. N., & Suhada, K. (2024). Penerapan Lean Manufacturing dengan Metode Value Stream Mapping untuk Mengurangi Cycle Time pada Bagian Perakitan Spring Mattress di PT X Application of Lean Manufacturing with Value Stream Mapping Method to Reduce Cycle Time in Spring Mattress Assembly a. Journal of Integrated System (JIS), 7(2), 111–133.

Siagian, W. T. W., & TEKMAPRO, J. A. S. (2024). Analisis Penerapan Lean Manufacturing Dengan Metode Vsm (Value Stream Mapping) Guna Mengurangi Waste Dan Cycle Time Pada Proses Produksi Keramik Di Pt Xyz.

Downloads

Published

2025-03-09